As demand for data processing and storage soars, largely driven by the rise of cloud computing and AI technologies, data centers have become crucial to the global digital infrastructure. However, with increased demand comes greater pressure on developers to construct these high-performance buildings quickly, efficiently and with stringent energy-efficiency standards in place. In this rapidly evolving landscape, insulated metal panels (IMPs) are emerging as a key solution for addressing these challenges.

Speed of Build

Data centers are complex and specialized structures. IMPs are prefabricated, single-component systems that are quick to install and help accelerate the overall speed of construction. Unlike traditional construction methods that rely on multiple trades, IMPs can be installed by a single team, reducing labor and equipment costs, and helping to speed up the construction process.

An additional advantage of IMPs is the ability to achieve a faster dry-in, allowing interior trades to begin work before the entire wall structure is completed. This time-saving advantage proved invaluable in the construction of NTT Global Data Centers Americas’ HI2 Data Center in Hillsboro, Oregon, a state-of-the-art facility that spans 420,000 square feet. The use of our KS Micro-Rib panels helped ensure that the project was completed on time and on budget, while also helping reduce labor and equipment costs compared to traditional concrete wall systems.

Energy Efficiency

Energy efficiency is paramount in data center design due to the massive energy requirements of these facilities. Data centers operate 24/7, and keeping the internal environment stable for sensitive equipment is crucial. IMPs offer strong thermal performance, with R-values up to 8.0 per inch, providing strong insulation that helps regulate internal temperatures and, in turn, reduce energy consumption.

IMPs create an airtight and weatherproof building envelope, preventing energy loss and reducing the need for excessive heating or cooling. For example, NTT’s HI2 Data Center, with its 31,000 square feet of Kingspan IMPs, benefits from these thermal efficiencies.

Flexibility for Future Growth

Data centers are not static; as demand for data processing increases, these facilities must be able to scale. IMPs offer flexibility in design, allowing for easy expansion and modification. Whether it’s adding additional capacity or adapting to new technologies, the scalability of data centers is essential, and IMPs support this growth by providing a versatile and adaptable building envelope.

With Kingspan’s IMPs, data center developers can future-proof their facilities, ensuring they have the infrastructure to meet growing demand.

A Smart Choice for Data Center Developers

In a market where speed, energy efficiency, and long-term performance are critical, IMPs are quickly becoming a strong building material choice for developers.

As seen with NTT's HI2 Data Center project, Kingspan’s IMPs not only contribute to faster construction and operational cost savings but also help create data centers that are ready for future growth. By leveraging the benefits of IMPs, data center developers can ensure that their facilities meet the demands of the digital age.

Kingspan's Data Center Solutions Guide

Your guide to insulated wall and roof systems for use in data center projects

Unlock optimal performance for your next data center project. Download the Kingspan Data Center Solutions Guide now to master efficiency, reliability, and future-ready infrastructure - featuring Kingspan's insulated metal panels.