Case Study

Chase Stadium

 When Major League Soccer’s Club Internacional de Fútbol Miami (Inter Miami CF) needed a home for its inaugural season, the clock was ticking. The project required constructing an 18,000-seat stadium alongside a state-of-the-art training facility—in under 10 months. 

  • Architect MANICA Architecture & Perez and Perez Architects Planners Inc.
  • Installer KHS&S Contractors
  • General Contractor Barton Malow, Lemartec Corp., Moss & Associates
kingspan-drv-pnk-stadium-fort-lauderdale-fl-dw4000-case-study-en-15

The Challenge: A 10-Month Blitz

MANICA Architecture and Perez and Perez Architects Planners Inc. specified insulated metal panels (IMPs) in team colours for Major League Soccer’s Club Internacional de Fútbol Miami’s (Inter Miami CF) DRV PNK Stadium. The facility includes a stadium and adjacent training center. IMPs in the team’s black and pink colors are on the stadium’s grandstands and the exterior of the training center. The project used Kingspan Insulated Panels Inc.’s Designwall 4000 IMPs with a flat profile in the team’s custom Grey, Dark Grey and Pink. 

By strategically selecting Kingspan Insulated Metal Panels (IMPs) with custom team branding, the design and construction team delivered a sleek, energy-efficient, and visually striking complex right on deadline. 

The Solution: Speed, Style & Performance

To meet the high-speed timeline without compromising structural integrity or aesthetics, design architects MANICA Architecture and Perez and Perez specified Kingspan Designwall 4000 Insulated Metal Panels (IMPs)

Location
Fort Lauderdale, Florida
Date Completed
March 2020
Project Sq. Ft.
50,000
kingspan-drv-pnk-stadium-ft-lauderdale-fl-dw4000-case-study-en-11

Talk to Us

What can we help you with?