<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" version="2.0">
  <channel>
    <title>Case Studies</title>
    <link>https://kipna.kingspan.com/en-us/case-studies</link>
    <description />
    <language>en-us</language>
    <pubDate>Thu, 03 Sep 2026 19:38:07 GMT</pubDate>
    <dc:date>2026-09-03T19:38:07Z</dc:date>
    <dc:language>en-us</dc:language>
    <item>
      <title>Browns Shoes Distribution Center | Kingspan</title>
      <link>https://kipna.kingspan.com/en-us/case-studies/browns-shoes</link>
      <description>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://kipna.kingspan.com/en-us/case-studies/browns-shoes?hsLang=en-us" title="" class="hs-featured-image-link"&gt; &lt;img src="https://kipna.kingspan.com/hubfs/Imported_Blog_Media/cq5dam_web_1280_1280-Aug-28-2026-07-27-46-5633-PM.jpg" alt="Browns Shoes Distribution Center | Kingspan" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;As North America’s leading independent footwear chain, Browns Shoes was founded in 1940 by Benjamin Brownstein. The single store sat on Sainte-Catherine Street, Montreal’s main commercial artery. Now, 80 years after its founding, Browns Shoes continues to operate as a family business, run by the third and fourth generation of Brownsteins.&amp;nbsp;&lt;/p&gt;</description>
      <content:encoded>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://kipna.kingspan.com/en-us/case-studies/browns-shoes?hsLang=en-us" title="" class="hs-featured-image-link"&gt; &lt;img src="https://kipna.kingspan.com/hubfs/Imported_Blog_Media/cq5dam_web_1280_1280-Aug-28-2026-07-27-46-5633-PM.jpg" alt="Browns Shoes Distribution Center | Kingspan" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;As North America’s leading independent footwear chain, Browns Shoes was founded in 1940 by Benjamin Brownstein. The single store sat on Sainte-Catherine Street, Montreal’s main commercial artery. Now, 80 years after its founding, Browns Shoes continues to operate as a family business, run by the third and fourth generation of Brownsteins.&amp;nbsp;&lt;/p&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=19576163&amp;amp;k=14&amp;amp;r=https%3A%2F%2Fkipna.kingspan.com%2Fen-us%2Fcase-studies%2Fbrowns-shoes&amp;amp;bu=https%253A%252F%252Fkipna.kingspan.com%252Fen-us%252Fcase-studies&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <pubDate>Thu, 03 Sep 2026 19:37:51 GMT</pubDate>
      <author>insidesales@kingspan.com (Kingspan Insulated Panels)</author>
      <guid>https://kipna.kingspan.com/en-us/case-studies/browns-shoes</guid>
      <dc:date>2026-09-03T19:37:51Z</dc:date>
    </item>
    <item>
      <title>Walled Lake Central High School | Kingspan</title>
      <link>https://kipna.kingspan.com/en-us/case-studies/walled-lake-central-high-school</link>
      <description>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://kipna.kingspan.com/en-us/case-studies/walled-lake-central-high-school?hsLang=en-us" title="" class="hs-featured-image-link"&gt; &lt;img src="https://kipna.kingspan.com/hubfs/Imported_Blog_Media/cq5dam_web_1280_1280-Aug-28-2026-07-28-18-7472-PM.jpg" alt="Walled Lake Central High School | Kingspan" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;Walled Lake Central High School in Walled Lake, Michigan, has been welcoming students for more than two decades. After all this time, the existing 25-year-old structure was failing, causing water intrusion to be an issue in the academic wing.&lt;/p&gt;</description>
      <content:encoded>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://kipna.kingspan.com/en-us/case-studies/walled-lake-central-high-school?hsLang=en-us" title="" class="hs-featured-image-link"&gt; &lt;img src="https://kipna.kingspan.com/hubfs/Imported_Blog_Media/cq5dam_web_1280_1280-Aug-28-2026-07-28-18-7472-PM.jpg" alt="Walled Lake Central High School | Kingspan" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;Walled Lake Central High School in Walled Lake, Michigan, has been welcoming students for more than two decades. After all this time, the existing 25-year-old structure was failing, causing water intrusion to be an issue in the academic wing.&lt;/p&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=19576163&amp;amp;k=14&amp;amp;r=https%3A%2F%2Fkipna.kingspan.com%2Fen-us%2Fcase-studies%2Fwalled-lake-central-high-school&amp;amp;bu=https%253A%252F%252Fkipna.kingspan.com%252Fen-us%252Fcase-studies&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <pubDate>Thu, 03 Sep 2026 17:31:42 GMT</pubDate>
      <author>insidesales@kingspan.com (Kingspan Insulated Panels)</author>
      <guid>https://kipna.kingspan.com/en-us/case-studies/walled-lake-central-high-school</guid>
      <dc:date>2026-09-03T17:31:42Z</dc:date>
    </item>
    <item>
      <title>Kingspan DeLand Headquarters</title>
      <link>https://kipna.kingspan.com/en-us/case-studies/kingspan-deland-headquarters</link>
      <description>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://kipna.kingspan.com/en-us/case-studies/kingspan-deland-headquarters?hsLang=en-us" title="" class="hs-featured-image-link"&gt; &lt;img src="https://kipna.kingspan.com/hubfs/Website/US%20and%20CA/Projects/Kingspan%20Deland/kingspan-deland-fl-ksmr-kp-kr-dw2000-ksr-case-study-36.jpg" alt="Kingspan DeLand Headquarters" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;span class="hs_cos_wrapper hs_cos_wrapper_widget hs_cos_wrapper_type_module" style=""&gt;&lt;/span&gt;</description>
      <content:encoded>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://kipna.kingspan.com/en-us/case-studies/kingspan-deland-headquarters?hsLang=en-us" title="" class="hs-featured-image-link"&gt; &lt;img src="https://kipna.kingspan.com/hubfs/Website/US%20and%20CA/Projects/Kingspan%20Deland/kingspan-deland-fl-ksmr-kp-kr-dw2000-ksr-case-study-36.jpg" alt="Kingspan DeLand Headquarters" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;span class="hs_cos_wrapper hs_cos_wrapper_widget hs_cos_wrapper_type_module" style=""&gt;&lt;/span&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=19576163&amp;amp;k=14&amp;amp;r=https%3A%2F%2Fkipna.kingspan.com%2Fen-us%2Fcase-studies%2Fkingspan-deland-headquarters&amp;amp;bu=https%253A%252F%252Fkipna.kingspan.com%252Fen-us%252Fcase-studies&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <category>product-group: Commercial &amp; Industrial</category>
      <category>product: QuadCore KS Series</category>
      <category>sector: Commercial and Offices</category>
      <category>color: Blue</category>
      <category>product: QuadCore B Designwall 2000</category>
      <category>color: Gray</category>
      <category>product-group: BENCHMARK</category>
      <category>product: QuadCore KarrierPanel</category>
      <category>product: KingSeam</category>
      <pubDate>Thu, 03 Sep 2026 14:27:32 GMT</pubDate>
      <author>insidesales@kingspan.com (Kingspan Insulated Panels)</author>
      <guid>https://kipna.kingspan.com/en-us/case-studies/kingspan-deland-headquarters</guid>
      <dc:date>2026-09-03T14:27:32Z</dc:date>
    </item>
    <item>
      <title>The Nest | Kingspan</title>
      <link>https://kipna.kingspan.com/en-us/case-studies/the-nest</link>
      <description>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://kipna.kingspan.com/en-us/case-studies/the-nest?hsLang=en-us" title="" class="hs-featured-image-link"&gt; &lt;img src="https://kipna.kingspan.com/hubfs/Imported_Blog_Media/cq5dam_web_1280_1280-Aug-28-2026-07-27-15-6305-PM.jpg" alt="The Nest | Kingspan " class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;The Nest – a 47,000 square foot apartment building in Burlington, Vermont – marks the first new residential construction project in Burlington’s Downtown District in over 15 years. The new building helped achieve the city’s goal of providing high density and mixed income housing. As a new apartment project in Vermont’s largest city, The Nest had a high standard to meet. The developer for the project, &lt;a href="https://www.nedderealestate.com/"&gt;Nedde Real Estate&lt;/a&gt;, asked for an iconic building that will be a downtown landmark and that utilizes green building practices during the construction process.&lt;/p&gt;</description>
      <content:encoded>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://kipna.kingspan.com/en-us/case-studies/the-nest?hsLang=en-us" title="" class="hs-featured-image-link"&gt; &lt;img src="https://kipna.kingspan.com/hubfs/Imported_Blog_Media/cq5dam_web_1280_1280-Aug-28-2026-07-27-15-6305-PM.jpg" alt="The Nest | Kingspan " class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;The Nest – a 47,000 square foot apartment building in Burlington, Vermont – marks the first new residential construction project in Burlington’s Downtown District in over 15 years. The new building helped achieve the city’s goal of providing high density and mixed income housing. As a new apartment project in Vermont’s largest city, The Nest had a high standard to meet. The developer for the project, &lt;a href="https://www.nedderealestate.com/"&gt;Nedde Real Estate&lt;/a&gt;, asked for an iconic building that will be a downtown landmark and that utilizes green building practices during the construction process.&lt;/p&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=19576163&amp;amp;k=14&amp;amp;r=https%3A%2F%2Fkipna.kingspan.com%2Fen-us%2Fcase-studies%2Fthe-nest&amp;amp;bu=https%253A%252F%252Fkipna.kingspan.com%252Fen-us%252Fcase-studies&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <pubDate>Wed, 02 Sep 2026 15:04:32 GMT</pubDate>
      <author>insidesales@kingspan.com (Kingspan Insulated Panels)</author>
      <guid>https://kipna.kingspan.com/en-us/case-studies/the-nest</guid>
      <dc:date>2026-09-02T15:04:32Z</dc:date>
    </item>
    <item>
      <title>Caledon Industrial Park | Kingspan</title>
      <link>https://kipna.kingspan.com/en-us/case-studies/caledon-industrial-park</link>
      <description>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://kipna.kingspan.com/en-us/case-studies/caledon-industrial-park?hsLang=en-us" title="" class="hs-featured-image-link"&gt; &lt;img src="https://kipna.kingspan.com/hubfs/Imported_Blog_Media/cq5dam_web_1280_1280-Aug-28-2026-07-30-00-6570-PM.jpg" alt="Caledon Industrial Park | Kingspan " class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;h5&gt;Highlights&lt;/h5&gt; 
&lt;ul&gt; 
 &lt;li&gt;Caledon Industrial Park’s Buildings B and C add up to a total of 573,083-square-feet. They accompany Building A, completed as part of Phase One of the project.&lt;/li&gt; 
 &lt;li&gt;Speed-of-build was critical for the building’s owner, who sought to lease out the buildings quickly to meet the demand in a growing area.&lt;/li&gt; 
 &lt;li&gt;Using Kingspan’s KS Shadowline panels and Accent Fin™ provided architects with design flexibility and elements that make the large buildings aesthetically pleasing.&lt;/li&gt; 
&lt;/ul&gt; 
&lt;h2&gt;An architectural look for a distribution center&lt;/h2&gt; 
&lt;p&gt;By using Kingspan IMPs, builders&amp;nbsp;&lt;a href="https://www.kingspan.com/us/en/campaigns/reducing-embodied-carbon/"&gt;&lt;strong&gt;can potentially reduce embodied carbon&lt;/strong&gt;&lt;/a&gt; compared to conventional concrete wall assemblies. IMPs also reduce operational carbon with thermal efficiency, assisting Caledon Industrial Park to seek LEED® certification.&lt;/p&gt;</description>
      <content:encoded>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://kipna.kingspan.com/en-us/case-studies/caledon-industrial-park?hsLang=en-us" title="" class="hs-featured-image-link"&gt; &lt;img src="https://kipna.kingspan.com/hubfs/Imported_Blog_Media/cq5dam_web_1280_1280-Aug-28-2026-07-30-00-6570-PM.jpg" alt="Caledon Industrial Park | Kingspan " class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;h5&gt;Highlights&lt;/h5&gt; 
&lt;ul&gt; 
 &lt;li&gt;Caledon Industrial Park’s Buildings B and C add up to a total of 573,083-square-feet. They accompany Building A, completed as part of Phase One of the project.&lt;/li&gt; 
 &lt;li&gt;Speed-of-build was critical for the building’s owner, who sought to lease out the buildings quickly to meet the demand in a growing area.&lt;/li&gt; 
 &lt;li&gt;Using Kingspan’s KS Shadowline panels and Accent Fin™ provided architects with design flexibility and elements that make the large buildings aesthetically pleasing.&lt;/li&gt; 
&lt;/ul&gt; 
&lt;h2&gt;An architectural look for a distribution center&lt;/h2&gt; 
&lt;p&gt;By using Kingspan IMPs, builders&amp;nbsp;&lt;a href="https://www.kingspan.com/us/en/campaigns/reducing-embodied-carbon/"&gt;&lt;strong&gt;can potentially reduce embodied carbon&lt;/strong&gt;&lt;/a&gt; compared to conventional concrete wall assemblies. IMPs also reduce operational carbon with thermal efficiency, assisting Caledon Industrial Park to seek LEED® certification.&lt;/p&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=19576163&amp;amp;k=14&amp;amp;r=https%3A%2F%2Fkipna.kingspan.com%2Fen-us%2Fcase-studies%2Fcaledon-industrial-park&amp;amp;bu=https%253A%252F%252Fkipna.kingspan.com%252Fen-us%252Fcase-studies&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <pubDate>Wed, 02 Sep 2026 15:00:07 GMT</pubDate>
      <author>insidesales@kingspan.com (Kingspan Insulated Panels)</author>
      <guid>https://kipna.kingspan.com/en-us/case-studies/caledon-industrial-park</guid>
      <dc:date>2026-09-02T15:00:07Z</dc:date>
    </item>
    <item>
      <title>West Bedford School | Kingspan</title>
      <link>https://kipna.kingspan.com/en-us/case-studies/west-bedford-school</link>
      <description>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://kipna.kingspan.com/en-us/case-studies/west-bedford-school?hsLang=en-us" title="" class="hs-featured-image-link"&gt; &lt;img src="https://kipna.kingspan.com/hubfs/Imported_Blog_Media/cq5dam_web_1280_1280-Aug-28-2026-07-26-24-0793-PM.jpg" alt="West Bedford School | Kingspan" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;Bedford, Nova Scotia, has seen extreme growth over the last few years due to its historic charm, scenic waterfront views, and famous natural harbor – one of the largest in the world. Bedford is a district of Halifax, also known as Nova Scotia’s capital. According to Statistics Canada’s&amp;nbsp;&lt;a href="https://signalhfx.ca/halifaxs-downtown-population-growing-at-fastest-pace-in-canada/"&gt;2021 census&lt;/a&gt;, the population of Halifax grew nearly 10% in just five years – a significant leap.&lt;/p&gt;</description>
      <content:encoded>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://kipna.kingspan.com/en-us/case-studies/west-bedford-school?hsLang=en-us" title="" class="hs-featured-image-link"&gt; &lt;img src="https://kipna.kingspan.com/hubfs/Imported_Blog_Media/cq5dam_web_1280_1280-Aug-28-2026-07-26-24-0793-PM.jpg" alt="West Bedford School | Kingspan" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;Bedford, Nova Scotia, has seen extreme growth over the last few years due to its historic charm, scenic waterfront views, and famous natural harbor – one of the largest in the world. Bedford is a district of Halifax, also known as Nova Scotia’s capital. According to Statistics Canada’s&amp;nbsp;&lt;a href="https://signalhfx.ca/halifaxs-downtown-population-growing-at-fastest-pace-in-canada/"&gt;2021 census&lt;/a&gt;, the population of Halifax grew nearly 10% in just five years – a significant leap.&lt;/p&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=19576163&amp;amp;k=14&amp;amp;r=https%3A%2F%2Fkipna.kingspan.com%2Fen-us%2Fcase-studies%2Fwest-bedford-school&amp;amp;bu=https%253A%252F%252Fkipna.kingspan.com%252Fen-us%252Fcase-studies&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <pubDate>Wed, 02 Sep 2026 14:51:42 GMT</pubDate>
      <author>insidesales@kingspan.com (Kingspan Insulated Panels)</author>
      <guid>https://kipna.kingspan.com/en-us/case-studies/west-bedford-school</guid>
      <dc:date>2026-09-02T14:51:42Z</dc:date>
    </item>
    <item>
      <title>H&amp;M Distribution Center | Kingspan</title>
      <link>https://kipna.kingspan.com/en-us/case-studies/h-and-m</link>
      <description>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://kipna.kingspan.com/en-us/case-studies/h-and-m?hsLang=en-us" title="" class="hs-featured-image-link"&gt; &lt;img src="https://kipna.kingspan.com/hubfs/Imported_Blog_Media/cq5dam_web_1280_1280-Aug-28-2026-07-27-17-4083-PM.jpg" alt="H&amp;amp;M Distribution Center | Kingspan " class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;&lt;a href="https://www2.hm.com/en_ca/index.html" title="https://www2.hm.com/en_ca/index.html"&gt;H&amp;amp;M&lt;/a&gt; is the sole tenant of the 716,646 square-foot warehouse located at the&amp;nbsp;&lt;a href="https://www.gtaeastindustrialpark.com/" title="https://www.gtaeastindustrialpark.com/"&gt;GTA East Industrial Park&lt;/a&gt;&amp;nbsp;in Ajax, Ontario, just east of Toronto. The Swedish retailer is using the warehouse to service stores throughout Canada while also facilitating its ecommerce demand.&lt;/p&gt;</description>
      <content:encoded>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://kipna.kingspan.com/en-us/case-studies/h-and-m?hsLang=en-us" title="" class="hs-featured-image-link"&gt; &lt;img src="https://kipna.kingspan.com/hubfs/Imported_Blog_Media/cq5dam_web_1280_1280-Aug-28-2026-07-27-17-4083-PM.jpg" alt="H&amp;amp;M Distribution Center | Kingspan " class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;&lt;a href="https://www2.hm.com/en_ca/index.html" title="https://www2.hm.com/en_ca/index.html"&gt;H&amp;amp;M&lt;/a&gt; is the sole tenant of the 716,646 square-foot warehouse located at the&amp;nbsp;&lt;a href="https://www.gtaeastindustrialpark.com/" title="https://www.gtaeastindustrialpark.com/"&gt;GTA East Industrial Park&lt;/a&gt;&amp;nbsp;in Ajax, Ontario, just east of Toronto. The Swedish retailer is using the warehouse to service stores throughout Canada while also facilitating its ecommerce demand.&lt;/p&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=19576163&amp;amp;k=14&amp;amp;r=https%3A%2F%2Fkipna.kingspan.com%2Fen-us%2Fcase-studies%2Fh-and-m&amp;amp;bu=https%253A%252F%252Fkipna.kingspan.com%252Fen-us%252Fcase-studies&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <pubDate>Wed, 02 Sep 2026 14:47:02 GMT</pubDate>
      <author>insidesales@kingspan.com (Kingspan Insulated Panels)</author>
      <guid>https://kipna.kingspan.com/en-us/case-studies/h-and-m</guid>
      <dc:date>2026-09-02T14:47:02Z</dc:date>
    </item>
    <item>
      <title>Port of Seattle’s Terminal 106 | Kingspan</title>
      <link>https://kipna.kingspan.com/en-us/case-studies/port-of-seattle-terminal-106</link>
      <description>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://kipna.kingspan.com/en-us/case-studies/port-of-seattle-terminal-106?hsLang=en-us" title="" class="hs-featured-image-link"&gt; &lt;img src="https://kipna.kingspan.com/hubfs/Imported_Blog_Media/cq5dam_web_1280_1280-Aug-28-2026-07-29-54-4183-PM.jpg" alt="Port of Seattle’s Terminal 106 | Kingspan" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;The &lt;a href="https://www.portseattle.org/"&gt;Port of Seattle’s&lt;/a&gt; current mission is to create 100,000 new jobs through port-driven economic growth, bringing the total number of port-related jobs in the region to 300,000, all while minimizing its environmental impact.&lt;/p&gt;</description>
      <content:encoded>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://kipna.kingspan.com/en-us/case-studies/port-of-seattle-terminal-106?hsLang=en-us" title="" class="hs-featured-image-link"&gt; &lt;img src="https://kipna.kingspan.com/hubfs/Imported_Blog_Media/cq5dam_web_1280_1280-Aug-28-2026-07-29-54-4183-PM.jpg" alt="Port of Seattle’s Terminal 106 | Kingspan" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;The &lt;a href="https://www.portseattle.org/"&gt;Port of Seattle’s&lt;/a&gt; current mission is to create 100,000 new jobs through port-driven economic growth, bringing the total number of port-related jobs in the region to 300,000, all while minimizing its environmental impact.&lt;/p&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=19576163&amp;amp;k=14&amp;amp;r=https%3A%2F%2Fkipna.kingspan.com%2Fen-us%2Fcase-studies%2Fport-of-seattle-terminal-106&amp;amp;bu=https%253A%252F%252Fkipna.kingspan.com%252Fen-us%252Fcase-studies&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <pubDate>Wed, 02 Sep 2026 09:01:39 GMT</pubDate>
      <author>insidesales@kingspan.com (Kingspan Insulated Panels)</author>
      <guid>https://kipna.kingspan.com/en-us/case-studies/port-of-seattle-terminal-106</guid>
      <dc:date>2026-09-02T09:01:39Z</dc:date>
    </item>
    <item>
      <title>Cornell Arts &amp; Entertainment Complex | Kingspan</title>
      <link>https://kipna.kingspan.com/en-us/case-studies/cornell-arts-and-entertainment-complex</link>
      <description>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://kipna.kingspan.com/en-us/case-studies/cornell-arts-and-entertainment-complex?hsLang=en-us" title="" class="hs-featured-image-link"&gt; &lt;img src="https://kipna.kingspan.com/hubfs/Imported_Blog_Media/cq5dam_web_1280_1280-Aug-28-2026-07-28-42-8547-PM.jpg" alt="Cornell Arts &amp;amp; Entertainment Complex | Kingspan" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;The Harry M. Cornell Arts &amp;amp; Entertainment Complex, located in Joplin, MO, is a collaborative effort between Connect2Culture and Spiva Center for the Arts. The facility, designed by DLR Group and CGA Architects and built by Crossland Construction Company, spans 37,000 square feet and features state-of-the-art galleries and a 450-seat hall for spoken word, cinema, musical, comedy, and local opera performances. The hall is centrally located within the building for optimal acoustic isolation and easy access from front and back of house support spaces.&lt;/p&gt;</description>
      <content:encoded>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://kipna.kingspan.com/en-us/case-studies/cornell-arts-and-entertainment-complex?hsLang=en-us" title="" class="hs-featured-image-link"&gt; &lt;img src="https://kipna.kingspan.com/hubfs/Imported_Blog_Media/cq5dam_web_1280_1280-Aug-28-2026-07-28-42-8547-PM.jpg" alt="Cornell Arts &amp;amp; Entertainment Complex | Kingspan" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;The Harry M. Cornell Arts &amp;amp; Entertainment Complex, located in Joplin, MO, is a collaborative effort between Connect2Culture and Spiva Center for the Arts. The facility, designed by DLR Group and CGA Architects and built by Crossland Construction Company, spans 37,000 square feet and features state-of-the-art galleries and a 450-seat hall for spoken word, cinema, musical, comedy, and local opera performances. The hall is centrally located within the building for optimal acoustic isolation and easy access from front and back of house support spaces.&lt;/p&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=19576163&amp;amp;k=14&amp;amp;r=https%3A%2F%2Fkipna.kingspan.com%2Fen-us%2Fcase-studies%2Fcornell-arts-and-entertainment-complex&amp;amp;bu=https%253A%252F%252Fkipna.kingspan.com%252Fen-us%252Fcase-studies&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <pubDate>Wed, 02 Sep 2026 03:51:09 GMT</pubDate>
      <author>insidesales@kingspan.com (Kingspan Insulated Panels)</author>
      <guid>https://kipna.kingspan.com/en-us/case-studies/cornell-arts-and-entertainment-complex</guid>
      <dc:date>2026-09-02T03:51:09Z</dc:date>
    </item>
    <item>
      <title>DynaEnergetics | Kingspan</title>
      <link>https://kipna.kingspan.com/en-us/case-studies/dynaenergetics</link>
      <description>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://kipna.kingspan.com/en-us/case-studies/dynaenergetics?hsLang=en-us" title="" class="hs-featured-image-link"&gt; &lt;img src="https://kipna.kingspan.com/hubfs/Imported_Blog_Media/cq5dam_web_1280_1280-Aug-28-2026-07-26-38-7543-PM.jpg" alt="DynaEnergetics | Kingspan" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;The challenge was a race against time: the design and construction of the facility needed to be complete in six months to set the machinery in place. There was only one rough sketch that architects had to transform into a multi-purpose facility.&lt;br&gt;&amp;nbsp;&lt;br&gt;However, the company’s modern vision quickly unfolded. It was critical to create a plan for a facility that was both functional and welcoming. The building’s design had to include gathering spaces for employees, administrative offices, a commercial kitchen and dining area, while also incorporating energy-saving measures.&lt;/p&gt;</description>
      <content:encoded>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://kipna.kingspan.com/en-us/case-studies/dynaenergetics?hsLang=en-us" title="" class="hs-featured-image-link"&gt; &lt;img src="https://kipna.kingspan.com/hubfs/Imported_Blog_Media/cq5dam_web_1280_1280-Aug-28-2026-07-26-38-7543-PM.jpg" alt="DynaEnergetics | Kingspan" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;The challenge was a race against time: the design and construction of the facility needed to be complete in six months to set the machinery in place. There was only one rough sketch that architects had to transform into a multi-purpose facility.&lt;br&gt;&amp;nbsp;&lt;br&gt;However, the company’s modern vision quickly unfolded. It was critical to create a plan for a facility that was both functional and welcoming. The building’s design had to include gathering spaces for employees, administrative offices, a commercial kitchen and dining area, while also incorporating energy-saving measures.&lt;/p&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=19576163&amp;amp;k=14&amp;amp;r=https%3A%2F%2Fkipna.kingspan.com%2Fen-us%2Fcase-studies%2Fdynaenergetics&amp;amp;bu=https%253A%252F%252Fkipna.kingspan.com%252Fen-us%252Fcase-studies&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <pubDate>Wed, 02 Sep 2026 03:30:50 GMT</pubDate>
      <author>insidesales@kingspan.com (Kingspan Insulated Panels)</author>
      <guid>https://kipna.kingspan.com/en-us/case-studies/dynaenergetics</guid>
      <dc:date>2026-09-02T03:30:50Z</dc:date>
    </item>
  </channel>
</rss>
